Universal Design Renovations

A hands on account of the trials & tribulations we encounter renovating a house for disability access.

Search

  • Blog
  • About
  • Free Downloads
  • Archives
  • Photo Gallery
  • Project Design Aspects
  • Our Partners
  • Media
  • How To …. Secrets
  • Bimbadeen
  • Categories

    • A Sea-Change Investment (13)
    • Bimbadeen (3)
    • Life Changing Events (4)
    • Renovation Rescue (73)
    • Technical Stuff (1)
    • The Road to Rehabilitation (1)
  • Photo Gallery Subpages

    • A Universal Design Blank Canvas
    • Week 1 The Carnage Begins
    • Week 2 Building Starts
    • Week 3 Building Preparation
    • Week 4 Poles go in.
    • Week 5-6 Serious Progress
    • Week 7 The Pour
    • Week 8 General Tidy Up
    • Week 9 Not All Goes To Plan
    • Week 10 Things start to take shape
    • Week 11 Platform For Progress
    • Week 12 Its the little things
    • Week 13 Up to level 2
    • Week 14 The deck goes down
    • Week 15-16 Decked Out
    • Week 17 Framing Begins
    • Week 18 Frame takes shape
    • Week 19 On the Way Up
    • Week 20 Walls All Up
    • Week 21 Ready for the roof
    • Week 23 Lift Away
    • Week 22 Roof & Structure
    • Week 24-25 Hebeled Up
    • Week 26-7 Looks like a house
    • Week 28 Cabled Up
    • Week 29 Plaster Away
    • Week 31 Floored
    • Week 32 More Internals
    • Week 33 Stairs & Floor Finished
    • Week 34 Electrical and Paint
    • Week 35 Painting Continues
    • Week 36 Altro Flooring Prep
    • Week 38 Rendering Begins
    • Week 39 Altro Floor Complete
    • Week 40 Bathrooms Begin
    • Week 42 Kitchens & Landscapes
    • Week 43 Retaining Walls
    • Week 45 Internal Fitout
    • Week 46-50 Moving In
    Back to Photo Gallery
  • Patio Sectional Seating Sets
  • Cellular Blinds
  • Furniture
  • Dickies Clothes
  • Circular Saw
  • Furniture store: modern furniture
  • Hot Tubs Winnipeg
  • Find a local plumber ,search by zip code
  • Ductless Mini Split
  • Shower Bath Suite Bathroom Suites

Week 43 Retaining Walls


levelling-and-stamping.jpg
kitchen-pantry.jpg
kitchen-caroursel.jpg
kitchen-cabinets.jpg
how-we-release-hydrostatic-buildup.jpg
how-the-boral-keystones-fix.jpg
fibreglass-peg-fixing-system.jpg
compacting-the-roadbase.jpg
boral-keystones-start-to-go-up.jpg
blocked-solid-boral-keystones.jpg
ag-pipe-under-20mm-bluemetal-all-along-the-back-wall.jpg
adjusting-the-boral-keystones.jpg
whack-packa.jpg
we-drill-out-the-ones-we-want-to-use-top-and-bottom.jpg
the-offending-heater.jpg
the-holes-clogged-up-with-overspill-concrete.jpg
stamping-and-levelling.jpg
plenty-of-drainage-in-the-lowest-corner.jpg
office-layout.jpg

Uses 3-Column Anaconda Theme design by Simple Thoughts.

RSS Entries and RSS Comments

    Universal Design Renovations Home

    Email Updates
    Enter your Email



  • Archives:
    • June 2009
    • May 2009
    • April 2009
    • January 2009
    • December 2008
    • November 2008
    • October 2008
    • September 2008
    • August 2008
    • July 2008
    • June 2008
    • May 2008
    • April 2008
    • March 2008
    • February 2008
    • January 2008
    • December 2007
    • November 2007
    • September 2007
    • June 2007
    • May 2007
    • December 2006
    • October 2006
    • September 2006
    • August 2006