Floors & Stairs All Done.


When we decided to use compressed bamboo from Style Plantations as a floor it was mainly on the basis that this was a material made from a fully renewable resource. Now that the team has finished installing on the upper level the look is fantastic. As the floor is fully glued in place there is not a nail in sight. This matches with the Deck-Max system we used for the decking. We ended up with expanses of decking without a nail in sight. Check out the floor for yourself.

Style Plantation Compressed Bamboo Flooring 1         Style Plantation Compressed Bamboo Flooring 2

 To match the natural timber look of the place we specified a natural black butt staircase. So that the structure looked light we opted to have the stair treads open. We knew that this would look good. The joiners came to the site and took all of the measurements. This is a “U” shaped stair so the construction was quite complicated. I was a bit skeptical about the process to begin with but John Bennett the builder said that this was the best way and that he had confidence in the joinery team. Well it all worked out perfectly. The stairs arrived on the back of a ute, and just plugged perfectly into place. No adjustment needed.

 Need to think about a gate.  Stairs Up they Go  Stair handrails and trim

 We want to use the stairs for physio practice so we will need to work out how to put handrails on both sides. We will also need to put a boom gate on upstairs to avoid nasty accidents with wheel chairs.


2 Responses to “Floors & Stairs All Done.”  

  1. 1 Vanessa

    The floor and stairs look magnificent! Thanks for sharing yet more great ideas. By the way, my husband and I have met with Harry Sprintz for help with making our home more accessible and I am eagerly looking forward to seeing his proposed design next week. I wouldn’t have known about his wonderful work if it wasn’t for your excellent web site. Thanks again.

    Vanessa :)

  2. 2 Alex

    Vanessa

    Thanks for your comments. I think that you will find Harry very helpful (If you can ever stop him telling you stories). The pace of the building, and the bills, is increasing. We are hopful of getting into the place sometime in the next 6 - 8 weeks. The next big jobs are the laying of the Altro safety flooring in the wet areas and the painting. At the same time the electricians are returing to do the final installations. And the kitchen is being made offsite at the moment. You should see a number of major changes over the next few weeks.

    Alex

Leave a Reply


Check Spelling
Activate Spell Check while Typing