This week has seen a lot of progress on the project.

Harry Sprintz has finished that last of the plans. We now have a collection of 29 sheets that will guide the finer points of the construction. I have posted these updated plans on the Free Downloads page. They are in PDF format so that anyone can print them off.

John Bennett the builder completed all of the external walls of the lower level and was able to pour the slab towards the end of the week. The weather was hot an windy so the team had to work hard and fast so that the concrete did not go off prior to leveling out. After a full hard days work the team retired for a well earned drink.

You can check out the week 7 photos in the gallery or simply by clicking here.

Next week will see the internal walls of the lower level start to go into place.